The flooring installer came to the house today to scrape and clean the concrete floors in preparation to lay the flooring. They are planning on putting down a thin layer of concrete tomorrow to make sure the entire floor is leveled.
Plus, the flooring was delivered today. Stacks and stacks of my beautiful new flooring that I am so eager to see installed. Installation should happen on Friday.
If all goes according to plan, the drywall and baseboards will be fixed on Monday and by the middle of next week my home should be all fixed. I hope that actually happens, because eventually I will have to go back to Utah for a week of work. I can’t keep putting that off.
Weather Check: 61°
